| Dragon LNG Project, Milford Haven |
| The Dragon LNG Project is an ongoing construction site in Milford Haven, Pembrokeshire
mpg have local Senior Quantity Surveying staff committed to this project carrying out cost planning, analysis and financial valuations on behalf of the Main Contractor on site. |
| |
| The project is the construction of a Liquid Natural Gas import facility on the site of a live oil and gas plant, to include: |
- Marine facilities
- Jetty topsides and transfer pipelines
- 2 x 160,000 m3 full containment LNG tanks
- Re-gasification plant and associated facilities
|
| The LNG
tanks will be roughly 145 feet high and 240 feet in diameter. They
are well insulated to keep the LNG at -161º in stable liquid form.
The tanks being built are two-wall tanks, with the first wall made
out of nickel steel that prevents low temperature failures. The
outer wall is made out of concrete. The LNG is pumped out of the
tanks and warmed so that it returns to natural gas which is then
pumped into the UK’s natural gas transmission system. |
 |